Because a world tour by sail without a good sailboat is destined to fail, here is the presentation of our means of transportation, our home, and our life insurance for the next two years: our sailboat Wije Blick II, a second-hand Sun Kiss 45 from the Jeanneau shipyard, built in 1985.

SUN KISS 45

It is a 13.25 meters long fixed keel live-aboard monohull. It was designed by naval architect Philippe Briand and produced in series with 315 units built between 1983 and 1992. This sailboat, being part of a large production series (for a sailboat of this size), benefits from extensive user feedback, a strong community of enthusiasts, and an excellent reputation.
 
Regarding the decision to choose a second-hand sailboat, it became an ecological and economical choice. Indeed, the production of a new sailboat consumes a considerable amount of raw materials, energy, and generates a large amount of waste and CO2 emissions. So, why not give a second life to one of the 140,000 abandoned sailboats that are languishing in our ports (according to ADEME)? 

After months of thorough research, visits, and comparisons of second-hand sailboats, our choice eventually fell on this sailboat, which had been out of the water for 3 years and required numerous repairs, including structural ones. What could have been seen as a constraint turned out to be the perfect opportunity to create a tailor-made sailboat for our world tour and learn all the technical skills that can be crucial in case of emergencies at sea.
Le Sun Kiss 45

THE SAILBOAT RENOVATION

PURCHASING THE SAILBOAT
January, 2020
Voilier dans le port à sec
Purchase of a Sun Kiss 45 built in 1985,
in poor condition and taken out of the water in 2015.
DISMANTLING
& UNSTEPPING THE MAST
February - March, 2020
Démontage de l'intérieur du voilier
Stripping down the interior
of the sailboat.
Removal of the engine, mast, and rudder.
STRUCTURAL WORKS
April - May, 2020
Stratification des varangues
Replacement and lamination
of damaged frames and stringers.
TRAVAUX PRÉPARATOIRES
DU CAR
ÉNAGE
Juin - Août 2020
carenage.png
Stripping the hull.
Overhauling through-hull fittings
and repairing the rudder.
REPLACEMENT OF PORTHOLES
August - November, 2020
Remplacement des panneaux en plexi
Refurbishment of fixed
and mobile portholes.
INTERIOR REFURBISHMENT
August, 2020 - September, 2021
découpe-cloison.jpg
Cutting and installation
of new interior partitions.
ELECTRICITY & WATER NETWORKS
September, 2021 - May, 2022
reseau-eau
Renovation of the tanks.
Installation of new water
and electricity networks.
SAILS & RIGGING
February, 2022 - June, 2022
rematage.jpg
Rigging and installation of navigation instruments, running rigging,
and standing rigging.
HULL MAINTENANCE
January, 2022 - June, 2022
Carénage_4.jpg
Continuation of hull cleaning
and antifouling application.
FLOORS
September, 2022
LAUNCHING THE SAILBOAT
November, 2022
planchers
Cutting and fitting of new floorboards.
Application of a protective oil.